Roofing & SolarSample Metro
A roof you stop thinking about.
Replacement, repair and solar for homes across the Sample Metro. One crew from inspection to final walk-through. Every price in writing before work starts.
- Inspection
- Free, 45 minutes
- Written quote
- Within 48 hours
- Typical install
- 1 to 3 days
01Services
Five things, done properly.
We keep the list short so the crew stays expert. Each job starts with an inspection and a written scope.
Roof replacement
Full tear-off to the deck, new underlayment, flashing and ventilation. Asphalt, metal or tile.
1 to 3 days 02Repair
Leaks, lifted shingles, failed flashing and soft decking. Fixed at the source, photographed before and after.
Same week 03Storm inspection
A documented roof check after hail or high wind, with a photo report you can keep for your records.
Within 48 hours 04Solar
Panels sized to your usage and your roof. Installed with the roof, or on its own when the roof is sound.
1 to 2 days 05Gutters
Seamless aluminium gutters and downspouts, sized for your roof area and pitched to drain.
1 day02Instant quote
Your price range, in five answers.
No email required. The roof on the right is yours, updated as you go.
How large is your home?
Total living area across all floors. A close guess is fine.
How many stories?
Taller homes need more staging and safety setup.
How steep is the roof?
Pitch is rise per 12 inches of run. Steeper roofs have more surface and slower work.
Which material?
Watch the roof. Each material has its own lifespan and price per square (100 sq ft).
Add solar?
A typical home uses 6 to 9 kW. Leave at zero for roof only.
- Roof area
- —
- Roof (materials + labour)
- —
- Solar
- —
area = (sq ft ÷ stories) × 1.15 overhang × pitch factorroof = area ÷ 100 × material rate × height × pitch laboursolar = kW × 1,000 × $2.70–3.30 per wattSample figures for a fictional business. Not an offer. A real quote follows an on-site inspection.
03Financing
See the monthly number first.
Move the amount, term and rate. Nothing here is a credit check or an offer.
Standard amortisation: payment = P × r ÷ (1 − (1 + r)−n). Rates shown are sample values for a fictional business, not a lender quote. Real terms depend on a lender's approval.
04Book an inspection
Pick a time. We bring the ladder.
Inspections are free and take about 45 minutes. You do not need to be on the roof, or home, if the side gate is open.
05Service area
Six zones. One yard in the middle.
Crews leave from one yard, so travel stays short and arrival windows stay honest.
Stylized map. Fictional zones for a fictional business.
Zone 04 of 06
Old Town
- Inspection lead time
- Next day
- Drive from yard
- ~10 min
- Common roofs
- Steep slate-look asphalt
06Process & warranty
Four steps. Nothing hidden between them.
The same project lead stays with you from the first ladder to the last nail sweep.
- 01
Inspect
Deck, flashing, ventilation and attic checked. Forty photos, shared with you the same day.
Day 0 · 45 min - 02
Quote in writing
One fixed price, line by line. Materials named, start date set. No pressure to sign.
Within 48 hours - 03
Install
Tarped landscaping, daily cleanup, magnetic sweep for nails. Solar wired the same week.
1 to 3 days - 04
Walk through
We go over the roof together, hand over photos, warranty papers and a care sheet.
Final day
Warranty, in plain words.
Sample coverage written for a fictional business, to show how terms would be presented.
| Workmanship | 10 yr | Leaks caused by how we installed it. We return and fix it at no cost. |
|---|---|---|
| Roofing materials | Maker | Passed through from the manufacturer. We file the claim for you. |
| Solar install | 10 yr | Roof penetrations, racking and wiring we installed. |
| Storm report | Kept | Your inspection photos stay on file and are yours to request any time. |
- Contractor license
- License # shown here
- Insurance
- Insurance certificate shown here
- Solar certification
- Certification # shown here